Chesterfield Hospital Phase 1

September 2015

Chesterfield-Hospital-003-800x400

Chesterfield Hospital Phase 1

By admin

This project we carried out for N G Bailey Limited – the pictures show External Chilled Water Pipework which has been insulated using Foil Rockwool section taped and enclosed using 24swg Stucco Aluminium Cladding riveted and identified to BS: 1710 – with mastic at all joints and removable aluminium boxes on all the valves and flanges (The valves and flanges are measured by Gill and manufactured on site at the Gill Head Office in Nottingham). The contract value was circa £100k